French - English

DFID

Objectives

  • Technical inspection of DFID offices.
  • Lightning strike caused damage to electrical equipment and concerns over safety of occupants.
  • Recent remedial  works and reports had not eradicated concerns.

Methodology

Carrying out a thorough visual inspection and tests of all electrical installations to establish:
  • The condition of  installations, esp. earthing
  • Compliance with standards (Local and EU)
  • Extent of remedial works required and
  • Comment upon residual risks to life safety.

Key Figures

Sector: Government Location: Kampala Surface area: 1,000 m² Project dates: 2009